Recommended test
Follow one small model from its first structural objects to the completed assembly.
- Open a generated model containing floor, wall and roof groups.
- Play the timeline once at overview speed, then return to the beginning.
- Step through slowly and pause when each major structural system becomes complete.
- Confirm that fading and visibility leave enough context to understand each transition.
- Identify three useful handoff stages for the Project Planner.
Read the sequence
The Build Timeline presents project objects in an ordered assembly sequence. Scrub through the timeline to understand when major systems appear and to inspect areas that become difficult to see in the complete model.
Control playback
Use play and step controls to move through the build. Adjust speed when you need a quick overview, then pause on structural transitions that deserve closer inspection. Fade behavior can help preserve context while new members appear.
Choose project stages
Useful project stages usually correspond to a clear handoff: floor structure complete, wall framing complete, roof structure complete, and finishes installed. Add those points to Project Planner rather than producing a page for every small timeline change.
The timeline is an explanatory model sequence. Adapt the final site sequence to project conditions and safe construction practice.